Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 13, 2017, 06:10 PM
  • Section#1_C 0356_C 0355__12132017__G6882.mp4

Date
12/13/2017
W/O
0643523
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00139
PipeID
P09819
Time
10:10 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6882
Sewer Name
C JOINT OUTFALL C - UNIT 8A
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
20171213DF_JOINT_OUTFALL_C_UNIT_8A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
C 0356
Downstream MH
C 0355
Dir. of Survey
Downstream
Length Surveyed
311 ft.
Total Length
311 ft.
Structural Index
3
Structural Quick
3X2K
Structural Rating
491
O&M Index
3
O&M Quick
3221
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
499
Pipe schematic from manhole C 0356 to C 0355
MH: C 0356MH: C 0355downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:14 AM0.1 ft. MWM - Water Mark, 30 %of cross sectional area0.1 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start161.9 ft. ID - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES170.9 ft. OBZ - Obstacles Other, 5 %of cross sectional area, at 02 o'clock - CALCIUM/RAGS195.7 ft. ID - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES209.7 ft. MGP - General Photograph - PEELING/FLAKING307.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311 ft. MSA - Survey Abandoned - NOT ENOUGH FLOW

Observation photos (6)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

    161.9 ft. - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

  • Obstacles Other, 5 %of cross sectional area, at 02 o'clock - CALCIUM/RAGS

    170.9 ft. - Obstacles Other, 5 %of cross sectional area, at 02 o'clock - CALCIUM/RAGS

  • Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES

    195.7 ft. - Infiltration Dripper, at 10 o'clock, within 8 inches of joint: YES

  • General Photograph - PEELING/FLAKING

    209.7 ft. - General Photograph - PEELING/FLAKING

Observations (14)

DistanceCodeObservation
2SAV
2CM
161.9ID
0.1MWM
2SSS
307.6SAV
0.1MWL
310.6CM
311MSANOT ENOUGH FLOW
0AMH10:14 AM
209.7MGPPEELING/FLAKING
170.9OBZCALCIUM/RAGS
195.7ID
309.4SSS

Properties (3)

custom_field_two
5
customer
LACSD
datetime
2017-12-13T10:10:42-08:00