D 0115_D 0114_1292017_040903.mp4
2 ft. - General Observation - MAG COAT 100% 8:00 TO 4:00 START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
20.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE UNDER MAG COAT
142.1 ft. - Surface Aggregate Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
148.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
199.8 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG
200.6 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK
| Distance | Code | Observation |
|---|---|---|
| 142.1 | SAV | SEVERE AGG |
| 0 | AMH | 3:50AM |
| 148.5 | SSS | BLISTERING CONCRETE |
| 20.2 | SSS | PEELING CONCRETE UNDER MAG COAT |
| 199.8 | SAV | SEVERE AGG |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 200.6 | DSZ | ROCK |
| 200.6 | MSA | ROCK 10% STOPPED CAMERA |
| 2 | MGO | MAG COAT 100% 8:00 TO 4:00 START |
| 200.6 | SSS | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |