Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 28, 2017, 10:12 AM
  • 22 0272A_22 0272_28112017_022202.mp4

Date
11/28/2017
W/O
674585
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00793
PipeID
P16558
Time
2:12 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5144
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_674585_TV22015_DEC2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0272A
Downstream MH
22 0272
Dir. of Survey
Downstream
Length Surveyed
168.4 ft.
Total Length
168.4 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
13
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole 22 0272A to 22 0272
MH: 22 0272AMH: 22 0272downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 0272A3 ft. MGO - General Observation - MAGNESIUM COATING START3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"77.1 ft. SRV - Surface Reinforcement Visible, from 09 to 01 o'clock, within 8 inches of joint: YES79.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start87.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"104.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish111 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"126.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"142.8 ft. LL - Alignment Left, 20 %165.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish168.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0272

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 01 o'clock, within 8 inches of joint: YES

    77.1 ft. - Surface Reinforcement Visible, from 09 to 01 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    79.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 20 %

    142.8 ft. - Alignment Left, 20 %

Observations (15)

DistanceCodeObservation
3MGOMAGNESIUM COATING START
142.8LL
6.3TFC
168.4AMH22 0272
77.1SRV
79.8SRV
104.4SRV
165.3SAP
0MWM
0MWL
0AMH22 0272A
87.8TFC
126.9TFA
3SAP
111TFC

Properties (4)

additional_info
SC346454
custom_field_two
2
customer
LACSD
datetime
2017-11-28T02:12:19-08:00