Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2017, 11:22 AM
  • 02 1362_02 1361 _23102017_044330.mp4

Date
10/23/2017
W/O
668762
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00277
PipeID
P03885
Time
4:22 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4998
Sewer Name
02 JANE STREET BRANCH TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11A
Purpose
Routine Assessment
Project
WO_668762_TV02342_NOV2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
02 1362
Downstream MH
02 1361
Dir. of Survey
Downstream
Length Surveyed
269.2 ft.
Total Length
269.2 ft.
Structural Index
3
Structural Quick
3421
Structural Rating
14
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole 02 1362 to 02 1361
MH: 02 1362MH: 02 1361downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 13623 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES3.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"11.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish45.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"108.8 ft. TFB - Tap Factory Made Abandoned, at 12 o'clock, -, within 8 inches of joint: YES, 6"132.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"187.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"226.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish229.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"234.5 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES237.3 ft. CM - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES243.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start265.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"266.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish266.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish269.2 ft. AMH - Downstream Manhole, Survey Ends - 02 1361

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES

    3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    234.5 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

    237.3 ft. - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    243.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
108.8TFB
14.5CM
243.4CM
266.8DAGS
0MWM
14.5CM
187.2TFA
45.3TF
132.8TF
0MWL
3DAGS
266.8CM
265.7TF
234.5CL
237.3CM
3.2TF
11.2CM
226.8CM
3DAE
269.2AMH02 1361
229.4TF
0AMH02 1362

Properties (5)

additional_info
SC350352
custom_field_two
3
customer
LACSD
datetime
2017-10-23T04:22:49-07:00
sewer_category
Gravity