32 0018_32 0017 _10192017_011813.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
132.4 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES
159.3 ft. - Crack Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES
168.4 ft. - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES
184 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES
191.7 ft. - Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 0 | MWM | — |
| 184 | CM | — |
| 4 | CM | — |
| 0 | AMH | 32 0017 |
| 132.4 | CS | — |
| 196 | MGO | Surface Spalling throughout the reach |
| 196.1 | AMH | 32 0018 |
| 159.3 | CS | — |
| 196.1 | DAGS | — |
| 2 | DAGS | — |
| 168.4 | CS | — |
| 191.7 | FM | — |