Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2016, 10:32 AM
  • 18 0662_18 0661 _12022016_025708.mp4

Date
12/02/2016
W/O
602450
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00696
PipeID
P14511
Time
2:32 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3895
Sewer Name
18 PHOEBE AVENUE TRUNK
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
WO_602450_TV18081_NOV2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
18 0662
Downstream MH
18 0661
Dir. of Survey
Downstream
Length Surveyed
297.1 ft.
Total Length
297.1 ft.
Structural Index
2
Structural Quick
3628
Structural Rating
35
O&M Index
2
O&M Quick
2K11
O&M Rating
119
Overall Index
2
Overall Quick
Overall Rating
154
Pipe schematic from manhole 18 0662 to 18 0661
MH: 18 0662MH: 18 0661downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 06620 ft. MWL - Water Level, 10 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start11.6 ft. MGO - General Observation - MAGNESIUM H.O. START12.3 ft. VC - Vermin Cockroach33.1 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES71.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"75.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"113.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start122.3 ft. OBZ - Obstacles Other, 10 %of cross sectional area, from 05 to 07 o'clock - DEBRIS144.2 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish171.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"177.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"196.4 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES204.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES230.3 ft. CM - Crack Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES, Start250 ft. CM - Crack Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES, Finish266.5 ft. CM - Crack Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES, Start272.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"278.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"278.2 ft. CM - Crack Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish294.1 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH294.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish297.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0661

Observation photos (7)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

    33.1 ft. - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    113.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    196.4 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    204.5 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES, Start

    230.3 ft. - Crack Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES, Start

    266.5 ft. - Crack Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
204.5CL
297.1AMH18 0661
177.6TFC
278.2TFC
250CM
196.4CL
294.1MGOMAGNEZIUM H.O. FINISH
11.6MGOMAGNESIUM H.O. START
230.3CM
0MWM
122.3OBZDEBRIS
272.5TFA
33.1CC
266.5CM
294.1DAGS
278.2CM
75.8TFC
12.3VC
2.2DAGS
0AMH18 0662
171.9TFC
144.2CL
0MWL
71.4TFA
113.9CL

Properties (5)

additional_info
SC305229
custom_field_two
3
customer
LACSD
datetime
2016-12-02T02:32:48-08:00
sewer_category
Gravity