Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2017, 11:06 AM
  • 04 0044_04 0043 _10272017_040659.mp4

Date
10/27/2017
W/O
663608
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00412
PipeID
P11773
Time
4:06 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5158
Sewer Name
04 LA CIENEGA BOULEVARD TRUNK
City
WEST HOLLYWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
03
Purpose
Routine Assessment
Project
WO_663608_TV04007_OCT2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
04 0044
Downstream MH
04 0043
Dir. of Survey
Downstream
Length Surveyed
144.2 ft.
Total Length
144.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
56
Pipe schematic from manhole 04 0044 to 04 0043
MH: 04 0044MH: 04 0043downstream0 ft. AMH - Upstream Manhole, Survey Begins - 04 00440 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"53 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"83.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"133.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK144.2 ft. AMH - Downstream Manhole, Survey Ends - 04 0043144.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2DAGS
83.6TF
144.2MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH04 0044
144.2AMH04 0043
53TF
131.1TF
55.3TFC
0MWL
86.8TFC
144.2DAGS
18.8TFC
133.8TFC
0MWM

Properties (5)

additional_info
SC346071
custom_field_two
4
customer
LACSD
datetime
2017-10-27T04:06:40-07:00
sewer_category
Gravity