Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 16, 2017, 09:09 AM
  • 18 0003_18 0002 _16102017_021004.mp4

Date
10/16/2017
W/O
641208
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00713
PipeID
P13818
Time
2:09 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5022
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_641208_TV18059_JUN2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0003
Downstream MH
18 0002
Dir. of Survey
Downstream
Length Surveyed
352.1 ft.
Total Length
352.1 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
210
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
210
Pipe schematic from manhole 18 0003 to 18 0002
MH: 18 0003MH: 18 0002downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00030 ft. MWM - Water Mark, 20 %of cross sectional area4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"71.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"96.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"160.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"194 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"200.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"233.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"288 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"325.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"344 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"352.1 ft. AMH - Downstream Manhole, Survey Begins - 18 0002352.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
233.2TF
288TF
325.4TF
352.1AMH18 0002
47.2TF
160.6TF
194TF
344TF
142.4TF
200.3TF
0MWL
4SAP
96.3TF
0AMH18 0003
0MWM
71.8TF
352.1SAP

Properties (5)

additional_info
SC346182
custom_field_two
3
customer
LACSD
datetime
2017-10-16T02:09:33-07:00
sewer_category
Gravity