J 0232_J 0231_1272017_020523.mp4
0 ft. - Downstream Manhole, Survey Begins( ABANDONED MH -CAPPED - 1:50AM
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00
161.8 ft. - Surface Aggregate Visible, from 03 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
186.3 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
189.1 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG
282.3 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
294.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SWOLLEN BLISTERING CONCRETE
344.5 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 27.9 | DSGV | — |
| 166.4 | SAV | SEVERE AGG SPORATIC |
| 0 | MWM | — |
| 0 | AMH | 1:50AM |
| 282.3 | SRV | CIRCUM REBAR |
| 347.2 | SSS | BLISTERING PEELING CONCRETE |
| 189.1 | SAV | SEVERE AGG |
| 347.2 | MGO | Conn. @ Mh, 9 O' Clock. Capped |
| 0 | MWL | — |
| 193.9 | SAP | SEVERE AGG |
| 172.9 | SAV | SEVERE AGG SPORATIC |
| 344.5 | SAV | SEVERE AGG |
| 347.2 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 51.6 | DSGV | — |
| 294.4 | SSS | SWOLLEN BLISTERING CONCRETE |
| 347.8 | AMH | 2:30AM |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | MGO | MAG COAT 60% START 8:00 TO 4:00 |
| 186.3 | SAP | SEVERE AGG |
| 347.2 | MGO | MAG COAT 60% FINISH |
| 161.8 | SAV | SEVERE AGG SPORATIC |