Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 6, 2017, 09:12 AM
  • Section#5_J 0233_J 0232__1262017__G6880.mp4

Date
12/06/2017
W/O
0624519
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11479
Time
1:12 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6880
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47
Purpose
Capital Improvement Program Assesment
Project
20171206MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0233
Downstream MH
J 0232
Dir. of Survey
Downstream
Length Surveyed
370.8 ft.
Total Length
370.8 ft.
Structural Index
2
Structural Quick
543F
Structural Rating
271
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
321
Pipe schematic from manhole J 0233 to J 0232
MH: J 0233MH: J 0232downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN OPEN 9:000 ft. AMH - Upstream Manhole, Survey Begins - 4:45AM0 ft. MGO - General Observation - MH CONN 3:00 STUB2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 70% START 8:00 TO 4:009.4 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC25 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC33.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE152.9 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR178.4 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC182.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG225.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE232.4 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR234.5 ft. SAP - Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG236.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG247.2 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start249 ft. MGO - General Observation - THICK JOINT257 ft. MGO - General Observation - MAG COAT 40% START282.2 ft. SRV - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR293.2 ft. SRV - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR370.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC370.2 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish370.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE370.2 ft. MGO - General Observation - MH CONN 9:00 ACTIVE370.8 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (15)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 70% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 70% START 8:00 TO 4:00

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    9.4 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC

    25 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    33.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    152.9 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    182.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    225.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    232.4 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    234.5 ft. - Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    236.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - THICK JOINT

    249 ft. - General Observation - THICK JOINT

  • General Observation - MAG COAT 40% START

    257 ft. - General Observation - MAG COAT 40% START

  • Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

    282.2 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

  • Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    293.2 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

Observations (27)

DistanceCodeObservation
152.9SRVCIRCUM REBAR
0MWM
2SSSBLISTERING PEELING CONCRETE
236.8SAVSEVERE AGG
0MWL
234.5SAPSEVERE AGG
0MGOMH CONN OPEN 9:00
182.1SAVSEVERE AGG
370.2SAVSEVERE AGG SPORATIC
178.4SAVSEVERE AGG SPORATIC
370.2DSGV
257MGOMAG COAT 40% START
370.8AMH5:25AM
9.4SAVSEVERE AGG SPORATIC
225.5SSSPEELING CONCRETE
370.2SSSBLISTERING PEELING CONCRETE
249MGOTHICK JOINT
247.2DSGV
0AMH4:45AM
25SAVSEVERE AGG SPORATIC
282.2SRVCIRCUM REBAR
370.2MGOMH CONN 9:00 ACTIVE
232.4SRVCIRCUM REBAR
2MGOMAG COAT 70% START 8:00 TO 4:00
0MGOMH CONN 3:00 STUB
33.4SSSPEELING CONCRETE
293.2SRVCIRCUM REBAR

Properties (4)

custom_field_three
CIRCUM REBAR
custom_field_two
2
customer
LACSD
datetime
2017-12-06T01:12:34-08:00