2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
4.2 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
24.9 ft. - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES
56.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 24.9 | FS | — |
| 4.2 | CM | — |
| 66.9 | DAGS | — |
| 23.5 | TB | — |
| 2.4 | DAGS | — |
| 66.9 | CM | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 0 | AMH | 22 1083 |
| 56.4 | DAGS | — |
| 66.9 | MGO | UNMAPPED MH |
| 66.9 | AMH | NEW MH 22 1082A |
| 56.4 | DAGS | — |
| 6 | TF | — |