Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 25, 2017, 10:32 PM
  • 29 0768_29 0767_11252017_144257.mp4

Date
11/25/2017
W/O
0674132
Weather
Dry
Operator/Surveyor
OLIVERIII
Sewer ID
Z01090
PipeID
P24668
Time
2:32 PM
Certificate
U-415-06024036
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0682
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
11252017ROIII_ALAMITOS_PUMPING_PLANT_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0767
Downstream MH
29 0768
Dir. of Survey
Upstream
Length Surveyed
252.1 ft.
Total Length
252.1 ft.
Structural Index
2
Structural Quick
2400
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 29 0767 to 29 0768
MH: 29 0767MH: 29 0768upstream0 ft. AMH - Upstream Manhole, Survey Ends - 03:20 PM2.9 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open11.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"14.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open16.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open55.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4", 4" - Open77.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4" - Open85.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"86.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES117 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES121.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"126.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open159 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open173.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES176.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES198.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"215.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open252.1 ft. MWL - Water Level, 5 %of cross sectional area252.1 ft. AMH - Downstream Manhole, Survey Begins - 02:39 PM252.1 ft. MWM - Water Mark, 10 %of cross sectional area

Observations (20)

DistanceCodeObservation
76CL
0MWL
240.4TFC
93.1TFOpen
165.2CL
166.7TFC
196.7TFOpen
237.8TFOpen
36.3TFOpen
54TFA
174.9TBOpen
135.1CL
130.9TFC
79CL
125.6TFOpen
0AMH02:39 PM
249.2TFOpen
235.6TFOpen
252.1AMH03:20 PM
0MWM

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-11-25T14:32:31-08:00