Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 27, 2017, 09:24 AM
  • B 1191_B 1190 _27092017_020548.mp4

Date
09/27/2017
W/O
663486
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z01125
PipeID
P13511
Time
2:24 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4278
Sewer Name
B JOINT OUTFALL B - UNIT 6H
City
S.PASADENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Routine Assessment
Project
WO_663486_TV16065_OCT2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
B 1190
Downstream MH
B 1191
Dir. of Survey
Upstream
Length Surveyed
165.4 ft.
Total Length
165.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
312F
O&M Rating
73
Overall Index
2
Overall Quick
Overall Rating
73
Pipe schematic from manhole B 1190 to B 1191
MH: B 1190MH: B 1191upstream0 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - B 11910.6 ft. OBZ - Obstacles Other, 15 %of cross sectional area, from 04 to 08 o'clock - LOG IN PIPELINE26.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES48.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES163.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start165.4 ft. MWL - Water Level, 15 %of cross sectional area165.4 ft. MWM - Water Mark, 25 %of cross sectional area165.4 ft. AMH - Downstream Manhole, Survey Begins - B 1190

Observation photos (4)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    117.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    139.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Obstacles Other, 15 %of cross sectional area, from 04 to 08 o'clock - LOG IN PIPELINE

    164.8 ft. - Obstacles Other, 15 %of cross sectional area, from 04 to 08 o'clock - LOG IN PIPELINE

Observations (9)

DistanceCodeObservation
2.1DAGS
0MWL
165.4DAGS
0MWM
164.8OBZLOG IN PIPELINE
0AMHB 1190
139.3DAE
165.4AMHB 1191
117.2DAE

Properties (4)

custom_field_two
4
customer
LACSD
datetime
2017-09-27T02:24:14-07:00
sewer_category
Gravity