Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2017, 09:25 AM
  • 32 1172_32 1171_19092017_024557.mp4

Date
09/19/2017
W/O
654216
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00839
PipeID
P19626
Time
2:25 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4879
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_654216_TV32021_AUG2017
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1172
Downstream MH
32 1171
Dir. of Survey
Downstream
Length Surveyed
568.4 ft.
Total Length
568.4 ft.
Structural Index
3
Structural Quick
3V2V
Structural Rating
565
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
565
Pipe schematic from manhole 32 1172 to 32 1171
MH: 32 1172MH: 32 1171downstream0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 32 11720 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.5 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start3.5 ft. MGO - General Observation - MAG COAT31.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"93.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"171 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"263.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"332.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"388.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"429.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"433.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"446.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"531 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"535.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"567 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish568.4 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish568.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1171

Observation photos (1)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    3.5 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (27)

DistanceCodeObservation
567SSS
531TF
433.9TF
219.1TF
535.4TFC
3.5SAV
388.9TF
446.8TF
429.6TF
2SSS
324.2TF
568.4SAV
0MGOLATERAL AT MH 3 OCLOCK
0MGOLATERAL AT MH 9 OCLOCK
248.4TF
332.6TF
31.6TF
568.4AMH32 1171
171TF
223.1TF
263.6TFA
0AMH32 1172
3.5MGOMAG COAT
93.2TF
97.2TFC
0MWM
0MWL

Properties (5)

additional_info
SC345939
custom_field_two
3
customer
LACSD
datetime
2017-09-19T02:25:28-07:00
sewer_category
Gravity