Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2017, 08:01 AM
  • 22 0916_22 0915 _09152017_010234.mp4

Date
09/15/2017
W/O
657826
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00799
PipeID
P17287
Time
1:01 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4973
Sewer Name
22 CONEY TRUNK, SECTS 2&3
City
AZUSA
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine assessment
Project
657826
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0916
Downstream MH
22 0915
Dir. of Survey
Downstream
Length Surveyed
304.3 ft.
Total Length
304.3 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 22 0916 to 22 0915
MH: 22 0916MH: 22 0915downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 09160 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT 9 OC0 ft. MWM - Water Mark, 35 %of cross sectional area3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING50.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"65.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"90.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"121.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"304.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish304.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish304.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0915

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING

    3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING

Observations (13)

DistanceCodeObservation
304.3DAGS
50.2TF
90.3TFC
304.3SSS
0AMH22 0916
121.6TFC
0MWL
304.3AMH22 0915
0MGOCONNECTION AT 9 OC
0MWM
3DAGS
3SSSMAG COATING
65.9TFC

Properties (5)

additional_info
SC345965
custom_field_two
3
customer
LACSD
datetime
2017-09-15T01:01:12-07:00
sewer_category
Gravity