Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 10:11 AM
  • 16 0537_16 0536 _29092017_031223.mp4

Date
09/29/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13588
Time
3:11 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_663060_TV16078_OCT2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0537
Downstream MH
16 0536
Dir. of Survey
Downstream
Length Surveyed
260.4 ft.
Total Length
260.4 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
153
O&M Index
2
O&M Quick
2I12
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
257
Pipe schematic from manhole 16 0537 to 16 0536
MH: 16 0537MH: 16 0536downstream0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05370 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COAT START2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start34.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"38.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"86.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"90.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"139.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"142.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"204.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"252.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"257 ft. MGO - General Observation - MAG COAT FINISH257 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish257 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.4 ft. VC - Vermin Cockroach260.4 ft. AMH - Downstream Manhole, Survey Ends - 16 0536

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
142.8TFC
0VC
257MGOMAG COAT FINISH
260.4VC
0MWM
0AMH16 0537
2.4DAGS
34.2TFC
2.4MGOMAG COAT START
204.8TFC
260.4AMH16 0536
2.4SAV
0MGOCONNECTION AT MH 3 O'CLOCK CAPPED
257DAGS
38.3TFC
252.9TBA
0MWL
139.5TF
257SAV
86.6TFC
90.7TFC

Properties (5)

additional_info
SC352127
custom_field_two
3
customer
LACSD
datetime
2017-09-29T03:11:49-07:00
sewer_category
Gravity