Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 10:00 AM
  • 16 0538_16 0537 _29092017_030009.mp4

Date
09/29/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13589
Time
3:00 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_663060_TV16078_OCT2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0538
Downstream MH
16 0537
Dir. of Survey
Downstream
Length Surveyed
222.2 ft.
Total Length
222.2 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
129
O&M Index
2
O&M Quick
2H11
O&M Rating
87
Overall Index
2
Overall Quick
Overall Rating
216
Pipe schematic from manhole 16 0538 to 16 0537
MH: 16 0538MH: 16 0537downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK MADE0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05380 ft. MWL - Water Level, 10 %of cross sectional area0 ft. VC - Vermin Cockroach2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COAT START2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"61.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"108.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"112.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"161.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"164.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"217.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish217.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish217.4 ft. MGO - General Observation - MAG COAT FINISH222.2 ft. AMH - Downstream Manhole, Survey Ends - 16 0537222.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
112.6TFC
0MGOCONNECTION AT MH 9 O'CLOCK MADE
222.2AMH16 0537
217.4SAV
0MWM
0AMH16 0538
217.4DAGS
217.4MGOMAG COAT FINISH
164.8TFC
222.2MGOCONNECTION AT MH 3 O'CLOCK CAPPED
0MWL
61.1TFC
161.4TFC
108.7TFC
8.1TFC
2.4SAV
0VC
2.4MGOMAG COAT START
2.4DAGS

Properties (5)

additional_info
SC352127
custom_field_two
3
customer
LACSD
datetime
2017-09-29T03:00:02-07:00
sewer_category
Gravity