- Date
- 06/01/2016
- W/O
- 574757
- Weather
- Dry
- Operator/Surveyor
- N. ZAHREDDINE
- Sewer ID
- Z00259
- PipeID
- P02643
- Time
- 10:59 AM
- Certificate
- N/A
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K3205
- Sewer Name
- 02 EAST COMPTON BOULEVARD RELIEF TRUNK
- City
- BELLFLWOER
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 37
- Purpose
- Routine Assessment
- Project
- WO_574757_TV02059_JUNE2016
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 24 in.
- Width
- 24 in.
- Upstream MH
- 02 0332
- Downstream MH
- 02 0331
- Dir. of Survey
- Downstream
- Length Surveyed
- 370.2 ft.
- Total Length
- 370.2 ft.
- Structural Index
- 4
- Structural Quick
- 4G31
- Structural Rating
- 169
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 4
- Overall Quick
- —
- Overall Rating
- 171
Pipe schematic from manhole 02 0332 to 02 0331 Observation photos (5)

70.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

91.1 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

121.1 ft. - Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

166.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

283.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES