Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 09:24 AM
  • 16 0540_16 0539 _29092017_022413.mp4

Date
09/29/2017
W/O
663060
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13591
Time
2:24 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4281
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_663060_TV16078_OCT2017
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0539
Downstream MH
16 0540
Dir. of Survey
Upstream
Length Surveyed
217.2 ft.
Total Length
217.2 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
129
O&M Index
2
O&M Quick
2H12
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
217
Pipe schematic from manhole 16 0539 to 16 0540
MH: 16 0539MH: 16 0540upstream0 ft. AMH - Upstream Manhole, Survey Ends - 16 05400 ft. VC - Vermin Cockroach1.8 ft. MGO - General Observation - MAG COAT FINISH1.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish6.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"16.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"59.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"63.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"86.9 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"91.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"115.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"165.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"171.3 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4"192.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"215.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start215.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start215.1 ft. MGO - General Observation - MAG COAT START217.2 ft. MWM - Water Mark, 15 %of cross sectional area217.2 ft. AMH - Downstream Manhole, Survey Begins - 16 0539217.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ACTIVE217.2 ft. VC - Vermin Cockroach217.2 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
153.7TFC
214.7DAGS
215.4MGOMAG COAT FINISH
217.2AMH16 0540
130.3TBA
157.5TFC
0MWM
2.1SAV
45.9TB
217.2VC
0AMH16 0539
0MGOCONNECTION AT MH 3 O'CLOCK ACTIVE
210.3TFC
2.1DAGS
215.4SAV
24.8TFC
101.8TFC
2.1MGOMAG COAT START
0VC
51.7TFC
125.4TFC
200.5TBA
0MWL

Properties (5)

additional_info
SC352127
custom_field_two
3
customer
LACSD
datetime
2017-09-29T02:24:05-07:00
sewer_category
Gravity