Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2016, 11:06 AM
  • 16 0514_16 0513 _11172016_032134.mp4

Date
11/17/2016
W/O
596918
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00659
PipeID
P13565
Time
3:06 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3881
Sewer Name
16 LAMANDA PARK TRUNK
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
18
Purpose
Routine Assessment
Project
WO_596918_TV16026_NOV2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0514
Downstream MH
16 0513
Dir. of Survey
Downstream
Length Surveyed
278.9 ft.
Total Length
278.9 ft.
Structural Index
3
Structural Quick
3321
Structural Rating
11
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 16 0514 to 16 0513
MH: 16 0514MH: 16 0513downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05140 ft. MWM - Water Mark, 20 %of cross sectional area4.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.5 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.1 ft. FC - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES40.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start40.5 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"61.2 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"92.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish101.2 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"101.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start104.4 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish121.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"148.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish161.7 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"180.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES182.6 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"222.8 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"242.9 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"275.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish278.9 ft. AMH - Downstream Manhole, Survey Ends - 16 0513

Observation photos (14)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES

    9.1 ft. - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    40.5 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    40.5 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"

    61.2 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    101.2 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    101.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    104.4 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    161.7 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    180.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"

    182.6 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    222.8 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"

    242.9 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"

Observations (22)

DistanceCodeObservation
222.8TBA
9.1FC
104.4RFJ
0MWL
4.5DAGS
180.6CM
101.3FL
242.9TBA
92.9FL
182.6TBA
121.3TBA
278.9AMH16 0513
101.2TBA
0AMH16 0514
0MWM
40.5FL
40.5TBA
275.1DAGS
161.7TBA
4.5RFJ
61.2TBA
148.9FL

Properties (5)

additional_info
SC305213
custom_field_two
2
customer
LACSD
datetime
2016-11-17T03:06:28-08:00
sewer_category
Gravity