Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2016, 07:56 AM
  • G 0210_G 0209_20160722_005750.mp4

Date
07/22/2016
W/O
582914
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01180
PipeID
P01114
Time
12:56 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3619
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_582914_TV01100_JULY2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
G 0210
Downstream MH
G 0209
Dir. of Survey
Downstream
Length Surveyed
333.3 ft.
Total Length
333.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2800
O&M Rating
16
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole G 0210 to G 0209
MH: G 0210MH: G 0209downstream0 ft. AMH - Upstream Manhole, Survey Begins - G 02100 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 2 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start299.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start331.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish331.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish333.3 ft. AMH - Downstream Manhole, Survey Ends - G 0209333.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOC

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    299.9 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMHG 0210
299.9DSZ
333.3AMHG 0209
0MWL
2DAGS
333.3MGOACTIVE CONNECTION AT MH 9 O'CLOC
331.5DSZ
0MGOACTIVE CONNECTION AT MH 2 O'CLOCK
331.5DAGS
0MWM

Properties (5)

additional_info
SC305798
custom_field_two
4
customer
LACSD
datetime
2016-07-22T00:56:55-07:00
sewer_category
Gravity