Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2016, 09:24 AM
  • 21 0998_21 0997_20160427_035345.mp4

Date
04/27/2016
W/O
557418
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00784
PipeID
P16098
Time
2:24 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K 3192
Sewer Name
21 SAN ANTONIO TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
06
Purpose
Routine Assessment
Project
WO_557418_TV21023_APRIL2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
21 0998
Downstream MH
21 0997
Dir. of Survey
Downstream
Length Surveyed
346.8 ft.
Total Length
346.8 ft.
Structural Index
4
Structural Quick
4231
Structural Rating
11
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 21 0998 to 21 0997
MH: 21 0998MH: 21 0997downstream0 ft. AMH - Upstream Manhole, Survey Begins - 21 09980 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"6.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES9.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES54.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"57.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"83.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start102.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"104.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"156.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"157.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"203.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"227.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"256.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"259.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"315.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"343.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish346.8 ft. VC - Vermin Cockroach346.8 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK346.8 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED346.8 ft. AMH - Downstream Manhole, Survey Ends - 21 0997

Observation photos (3)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    6.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    9.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    83.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
9.9CM
0AMH21 0998
102.6TFC
156.6TFC
346.8VC
157.8TFC
227.3TFC
315.9TFC
256.1TFC
346.8MGOCONNECTION AT THE MH 3 OC'LOCK
54.9TFC
346.8MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
4TFC
343.9FM
0MWM
6.4FM
346.8AMH21 0997
57.5TFC
0MWL
203.8TF
104.3TB
83.6FM
259.2TF

Properties (5)

additional_info
SC226240
custom_field_two
2
customer
LACSD
datetime
2016-04-27T02:24:43-07:00
sewer_category
GRAVITY