Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2016, 08:53 AM
  • 29 0036_C 0622 _08162016_015606.mp4

Date
08/16/2016
W/O
582915
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00020
PipeID
P23816
Time
1:53 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3637
Sewer Name
29 EASTSIDE INTERCEPTOR TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
20
Purpose
Routine Assessment
Project
WO_582915_TV29022_JULY2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
29 0036
Downstream MH
C 0622
Dir. of Survey
Downstream
Length Surveyed
257 ft.
Total Length
257 ft.
Structural Index
3
Structural Quick
5133
Structural Rating
16
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 29 0036 to C 0622
MH: 29 0036MH: C 0622downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 00360 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES, 6ft117.6 ft. MMC - Material Change, Concrete pipe (non-reinfored)117.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start117.6 ft. HSV - Hole Soil Visible, at 08 o'clock, within 8 inches of joint: YES130.3 ft. MMC - Material Change, Vitrified clay pipe130.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish130.3 ft. RPP - Repair Patch, from 07 to 08 o'clock, within 8 inches of joint: YES - SMALL PATCH257 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish257 ft. AMH - Downstream Manhole, Survey Ends - C 0622257 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES, 6ft

    2 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES, 6ft

  • Material Change, Concrete pipe (non-reinfored)

    117.6 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    117.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Hole Soil Visible, at 08 o'clock, within 8 inches of joint: YES

    117.6 ft. - Hole Soil Visible, at 08 o'clock, within 8 inches of joint: YES

  • Material Change, Vitrified clay pipe

    130.3 ft. - Material Change, Vitrified clay pipe

Observations (14)

DistanceCodeObservation
130.3MMC
117.6MMC
257DAGS
117.6SAV
130.3SAV
130.3RPPSMALL PATCH
0MWL
0AMH29 0036
117.6HSV
0MWM
2DAGS
257AMHC 0622
257MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2CL

Properties (5)

additional_info
SC306072
custom_field_two
2
customer
LACSD
datetime
2016-08-16T01:53:55-07:00
sewer_category
Gravity