Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2017, 05:40 AM
  • 32 0134_32 0133_14092017_230656.mp4

Date
09/14/2017
W/O
658035
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00887
PipeID
P19882
Time
10:40 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4875
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_658035_TV32048_SEP2017
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0134
Downstream MH
32 0133
Dir. of Survey
Downstream
Length Surveyed
497.8 ft.
Total Length
497.8 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
498
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
498
Pipe schematic from manhole 32 0134 to 32 0133
MH: 32 0134MH: 32 0133downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 01342.1 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start461.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES497.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish497.8 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish497.8 ft. AMH - Downstream Manhole, Survey Ends - 32 0133

Observation photos (4)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    461.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish

    497.8 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish

Observations (10)

DistanceCodeObservation
497.8SSS
0MWM
461.5SAP
2.1SAV
497.8SAV
0MGOCONNECTION AT MH 9 O'CLOCK
497.8AMH32 0133
0MWL
0AMH32 0134
2.1SSS

Properties (5)

additional_info
SC345934
custom_field_two
2
customer
LACSD
datetime
2017-09-14T22:40:32-07:00
sewer_category
Gravity