Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 30, 2014, 08:42 AM
  • 22 0232_22 0231_20141230_010229.mp4

Date
12/30/2014
W/O
481935
Weather
Dry
Operator/Surveyor
ERU
Sewer ID
Z00793
PipeID
P16513
Time
12:42 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K1998
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_481935_TV22017_2014DECEMBER
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Upstream MH
22 0231
Downstream MH
22 0232
Dir. of Survey
Upstream
Length Surveyed
386.2 ft.
Total Length
386.2 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
228
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
228
Pipe schematic from manhole 22 0231 to 22 0232
MH: 22 0231MH: 22 0232upstream0 ft. AMH - Upstream Manhole, Survey Ends - 010227.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"40.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"76.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"88.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"137.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"148.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"185 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"195.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"232.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"244.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"282.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"293.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"297.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"305.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"340.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"353.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"380.2 ft. MGO - General Observation - MAG COATING THROUGHOUT PIPE386.2 ft. AMH - Downstream Manhole, Survey Begins - 0043386.2 ft. MWM - Water Mark, 35 %of cross sectional area386.2 ft. MWL - Water Level, 35 %of cross sectional area

Observations (21)

DistanceCodeObservation
0AMH0043
141.4TFC
153.4TF
104TF
201.2TFC
92.9TFC
0MWM
81.1TFC
89TFA
237.6TF
358.5TFC
32.6TFA
45.5TFC
309.4TF
297.3TFC
0MWL
345.8TF
248.7TF
190.6TFA
386.2AMH0102
6MGOMAG COATING THROUGHOUT PIPE

Properties (5)

additional_info
SC189563
custom_field_two
4
customer
LACSD
datetime
2014-12-30T00:42:11-08:00
sewer_category
GRAVITY