Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 2, 2017, 11:33 AM
  • J 0242_J 0241_1122017_045441.mp4

Date
11/02/2017
W/O
0624519
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11488
Time
4:33 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0668
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALO VERDES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
46
Purpose
Routine Assessment
Project
20171102MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0242
Downstream MH
J 0241
Dir. of Survey
Downstream
Length Surveyed
456.7 ft.
Total Length
456.7 ft.
Structural Index
4
Structural Quick
5434
Structural Rating
34
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
36
Pipe schematic from manhole J 0242 to J 0241
MH: J 0242MH: J 0241downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DSGV - Deposits Settled Gravel, 10 %of cross sectional area, from 04 to 06 o'clock, , within 8 inches of joint: NO2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:0031.4 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG81.8 ft. SAV - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC85.2 ft. SRV - Surface Reinforcement Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR96 ft. SAV - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR108.5 ft. SAV - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG109.4 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR140 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO, Start - CIRCUM143.3 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO, Finish - CIRCUM209.7 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR456.4 ft. MGO - General Observation - MAG COAT 80% RFINISH456.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE456.4 ft. MGO - General Observation - MH CONN 9:00 ACTIVE456.7 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (10)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    31.4 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    81.8 ft. - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Reinforcement Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    85.2 ft. - Surface Reinforcement Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    96 ft. - Surface Aggregate Visible, from 08 to 09 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

    108.5 ft. - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

    109.4 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO, Start - CIRCUM

    140 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: NO, Start - CIRCUM

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

    209.7 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

Observations (19)

DistanceCodeObservation
456.4MGOMAG COAT 80% RFINISH
209.7SRVCIRCUM REBAR
31.4SAVSEVERE AGG
96SAVCIRCUM REBAR
143.3SRVCIRCUM
2DSGV
0MWL
85.2SRVCIRCUM REBAR
0AMH4:50AM
2SSSBLISTERING PEELING CONCRETE
140SRVCIRCUM
109.4SRVCIRCUM REBAR
81.8SAVSEVERE AGG SPORATIC
456.4SSSBLISTERING PEELING CONCRETE
2MGOMAG COAT 80% START 8:00 TO 4:00
456.4MGOMH CONN 9:00 ACTIVE
108.5SAVSEVERE AGG
0MWM
456.7AMH5:25AM

Properties (4)

custom_field_three
CIRCUM REBAR VISIBLE
custom_field_two
2
customer
LACSD
datetime
2017-11-02T04:33:28-07:00