Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2017, 08:09 AM
  • 22 0254_22 0253_25012017_000937.mp4

Date
01/25/2017
W/O
613443
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00793
PipeID
P16536
Time
12:09 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4133
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_613443_TV22016_JAN2017
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0254
Downstream MH
22 0253
Dir. of Survey
Downstream
Length Surveyed
272.8 ft.
Total Length
272.8 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
162
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
162
Pipe schematic from manhole 22 0254 to 22 0253
MH: 22 0254MH: 22 0253downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02540 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start3.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"7.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"40 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"76.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"79.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"151.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"155.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"206 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"270.2 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish272.8 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK272.8 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK272.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0253

Observation photos (1)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
151.9TF
272.8MGOCONNECTION AT THE MH 3 O'CLOCK
272.8MGOCONNECTION AT THE MH 9 O'CLOCK
206TFC
2.1SAP
79.6TFC
270.2SAP
0MWM
7.6TFC
202.9TF
3.9TF
76.5TF
40TFC
0AMH22 0254
155.1TFC
272.8AMH22 0253
0MWL

Properties (5)

additional_info
SC306489
custom_field_two
3
customer
LACSD
datetime
2017-01-25T00:09:03-08:00
sewer_category
Gravity