2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
27.3 ft. - Surface Aggregate Projecting, from 10 to 11 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
27.3 ft. - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
37.3 ft. - Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: NO - BROKEN CIRCUM REBAR POSSIBLE
37.3 ft. - Surface Reinforcement Corroded, from 10 to 12 o'clock, within 8 inches of joint: NO - BROKEN CIRCUM REBAR POSSIBLE
49.2 ft. - General Observation - EXSTREAM DROP IN FLOW
55 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00
55 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
104.2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
116.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE UNDER MAG COAT
160 ft. - Water Mark, 50 %of cross sectional area
278.5 ft. - General Observation - MAG COAT 80% START 9:00 TO 3:00
278.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - AEVERE AGG
278.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
309.8 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG
447.7 ft. - General Observation - 95% MAG COAT START
| Distance | Code | Observation |
|---|---|---|
| 55 | MGO | MAG COAT 95% FINISH |
| 55 | MWL | — |
| 491 | SSS | PEELING CONCRETE |
| 17.7 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 104.2 | SAM | SEVERE AGG |
| 491 | SAM | SEVERE AGG |
| 0 | MGO | MAG COAT 90% START 10:00 TO 2:00 |
| 491.1 | MGO | MAG COAT 95% FINISH |
| 309.8 | SAM | SEVERE AGG |
| 37.3 | SRC | BROKEN CIRCUM REBAR POSSIBLE |
| 55 | SAM | SEVERE AGG |
| 278.5 | MGO | MAG COAT 80% START 9:00 TO 3:00 |
| 37.3 | SRC | BROKEN CIRCUM REBAR POSSIBLE |
| 160 | MWM | — |
| 27.3 | SAP | SEVERE AGG |
| 0 | MGO | MH CONN 9:00 OPEN STOPLOG IN PLACE |
| 0 | MWL | — |
| 491.6 | AMH | 2:00AM |
| 55 | MGO | MAG COAT 80% START 8:00 TO 4:00 |
| 55 | SAP | SEVERE AGG |
| 27.3 | SAP | SEVERE AGG |
| 278.5 | SSS | PEELING CONCRETE |
| 55 | MWM | — |
| 160 | MWL | — |
| 2 | SAM | SEVERE AGG |
| 55 | SAM | SEVERE AGG UNDER MAG COAT |
| 278.5 | SAM | AEVERE AGG |
| 116.7 | SSS | PEELING CONCRETE UNDER MAG COAT |
| 447.7 | MGO | 95% MAG COAT START |
| 55 | SAP | SEVERE AGG |
| 0 | — | — |
| 278.5 | SAM | SEVERE AGG |
| 0 | AMH | 1:05AM |
| 49.2 | MGO | EXSTREAM DROP IN FLOW |
| 278.5 | SSS | PEELING CONCRETE |