04 0021_04 0020_10172017_013629.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LATTANCE
2 ft. - General Observation - MAG COAT 5%START 10:00 TO 2:00
8 ft. - General Observation - 21" RCP
16.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT
16.1 ft. - General Observation - MAG COAT 30% START
113.8 ft. - Surface Spalling, from 09 to 12 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
143.2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
307.8 ft. - General Observation - 21" RCP
| Distance | Code | Observation |
|---|---|---|
| 491.1 | SSS | BLISTERING CONCRETE |
| 2 | SSS | BLISTERING PEELING LATTANCE |
| 2 | MGO | MAG COAT 5%START 10:00 TO 2:00 |
| 491 | SSS | BLISTERING PEELING LAITANCE COAT |
| 268.3 | TF | Open |
| 0 | AMH | 1:30AM |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 307.8 | MGO | 21" RCP |
| 491.7 | AMH | 2:05AM |
| 0 | MWM | — |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 16.1 | SSS | BLISTERING LAITANCE COAT |
| 8 | MGO | 21" RCP |
| 16.1 | MGO | MAG COAT 30% START |
| 113.8 | SSS | BLISTERING CONCRETE |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 143.2 | SSS | BLISTERING CONCRETE |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 0 | MWL | — |