Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2017, 11:00 AM
  • Section#2_04 0015_04 0014__10142017__G6854.mp4

Date
10/14/2017
W/O
0630073
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00408
PipeID
P11743
Time
4:00 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6854
Sewer Name
04 DISTRICT #4 OUTFALL TRUNK
City
BEVERLY HILLS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
03
Purpose
Routine Assessment
Project
20171014MDM_DISTRICT_4_0UTFALL_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
04 0015
Downstream MH
04 0014
Dir. of Survey
Downstream
Length Surveyed
547.8 ft.
Total Length
547.8 ft.
Structural Index
2
Structural Quick
2U00
Structural Rating
222
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
222
Pipe schematic from manhole 04 0015 to 04 0014
MH: 04 0015MH: 04 0014downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:00AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT113.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT146.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LATANCE COAT547.2 ft. MGO - General Observation - MAG COAT FINISH 80%547.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING LAITANCE COAT547.8 ft. AMH - Downstream Manhole, Survey Ends - 4:30AM

Observation photos (4)

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

    113.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LATANCE COAT

    146.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LATANCE COAT

Observations (10)

DistanceCodeObservation
547.8AMH4:30AM
0MWL
146.9SSSBLISTERING LATANCE COAT
0AMH4:00AM
547.2MGOMAG COAT FINISH 80%
113.6SSSBLISTERING LAITANCE COAT
547.2SSSBLISTERING LAITANCE COAT
0MWM
2MGOMAG COAT 80% START 8:00 TO 4:00
2SSSBLISTERING LAITANCE COAT

Properties (4)

custom_field_three
SPALLING BLISTERING LAITANCE COAT
custom_field_two
4
customer
LACSD
datetime
2017-10-14T04:00:00-07:00