Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2017, 06:54 AM
  • 05 1381_05 1380 _30082017_235522.mp4

Date
08/30/2017
W/O
652020
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06601
Time
11:54 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4804
Sewer Name
05 MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
WO_652020_TV05074_AUG2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 1381
Downstream MH
05 1380
Dir. of Survey
Downstream
Length Surveyed
387 ft.
Total Length
387 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 05 1381 to 05 1380
MH: 05 1381MH: 05 1380downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 13810 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area43.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"82.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES83.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.4 ft. RTJ - Roots Tap Joint, at 10 o'clock, 5 %, within 8 inches of joint: YESR124 ft. MGO - General Observation - CHIPPING AT 2 O'CLOCK124.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.7 ft. RTL - Roots Tap Lateral, at 10 o'clock, 10 %165.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"214.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"247.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: NO, 6" - BROKEN285.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"335.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"387 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK387 ft. AMH - Downstream Manhole, Survey Ends - 05 1380

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES

    82.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES

  • Roots Tap Joint, at 10 o'clock, 5 %, within 8 inches of joint: YESR

    123.4 ft. - Roots Tap Joint, at 10 o'clock, 5 %, within 8 inches of joint: YESR

Observations (18)

DistanceCodeObservation
335.9TFC
124.7TF
0AMH05 1381
165.7TF
124.7RTL
43.4TFC
203.9TF
0MWL
387MGOCONNECTION AT MH 9 O'CLOCK
124MGOCHIPPING AT 2 O'CLOCK
123.4RTJ
247.1TFDBROKEN
214.3TFC
0MWM
82.8DAGS
83.9TF
285.1TFC
387AMH05 1380

Properties (5)

additional_info
SC345913
custom_field_two
3
customer
LACSD
datetime
2017-08-30T23:54:38-07:00
sewer_category
Gravity