Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 6, 2017, 09:45 AM
  • 05 0965_05 0964 _06072017_041450.mpg

Date
07/06/2017
W/O
630086
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00481
PipeID
P06197
Time
2:45 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4552
Sewer Name
05 MANCHESTER AVENUE PUMP TRUNK
City
HAWTHORNE
Loc. details
Railway
Location Code
L
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
WO_630086_TV05069_JUN2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0964
Downstream MH
05 0965
Dir. of Survey
Upstream
Length Surveyed
284.3 ft.
Total Length
284.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
3123
O&M Rating
9
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 05 0964 to 05 0965
MH: 05 0964MH: 05 0965upstream0 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIS0 ft. MSA - Survey Abandoned - DEBRIS0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish5.1 ft. DAR - Deposits Attached Ragging, 20 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES35.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS42.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"49.4 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES88 ft. FS - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES101.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"154.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"203 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"260.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"280.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start284.3 ft. MWL - Water Level, 15 %of cross sectional area284.3 ft. AMH - Downstream Manhole, Survey Begins - 05 0964284.3 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    196.3 ft. - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Deposits Settled Compacted,  5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    234.9 ft. - Deposits Settled Compacted, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    249 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Deposits Attached Ragging, 20 %of cross sectional area, from 03 to 06 o'clock,  , within 8 inches of joint: YES

    279.2 ft. - Deposits Attached Ragging, 20 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
81.3TFC
241.5TFC
284.3DSZDEBRIS
234.9DSC
0MWL
249DSZDEBRIS
284.3MSADEBRIS
196.3FS
23.7TFC
279.2DAR
0AMH05 0964
0MWM
130TFC
182.7TFC
3.8DAGS
284.3DAGS

Properties (5)

additional_info
SC345383
custom_field_two
5
customer
LACSD
datetime
2017-07-06T02:45:10-07:00
sewer_category
Gravity