Wastewater/Activity/PacpInspection/1.0Oct 4, 2017, 07:54 AM
  • Section#7_G 0322_G 0321__1042017__G6838.mp4

Date
10/04/2017
W/O
0663237
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00228
PipeID
P01758
Time
12:54 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6838
Sewer Name
G JOIINT OUTFALL G- UNIT 9 TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Capital Improvement Program Assesment
Project
20171002MDM_JOINT_OUTFALL_G_UNIT_9_TRUNK
Material
RCP-CTL
Shape
Circular
Height
30 in.
Upstream MH
G 0322
Downstream MH
G 0321
Dir. of Survey
Downstream
Length Surveyed
349.8 ft.
Total Length
349.8 ft.
Structural Index
5
Structural Quick
5E42
Structural Rating
148
O&M Index
3
O&M Quick
513M
O&M Rating
212
Overall Index
4
Overall Quick
Overall Rating
360
Pipe schematic from manhole G 0322 to G 0321
MH: G 0322MH: G 0321downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:15AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES2 ft. MGO - General Observation - 10% MISSING TILES START 8:00 TO 4:02 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - TILES & DEBRIE16.9 ft. MGO - General Observation - 90% MISSING TILES START20 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR26.7 ft. SRC - Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM BROKEN MISSING27.7 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR34.2 ft. SRC - Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR MISSING34.2 ft. MGO - General Observation - 10% MISSING TILES START54.6 ft. MGO - General Observation - 30% MISSING TILES59.7 ft. MGO - General Observation - 90% MISSING TILESW START61.5 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR69.8 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - ALMOST GONE73.5 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - REBAR CORRODED AWAY77.9 ft. MGO - General Observation - 20% MISSING TILES START77.9 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR CORRODED AWAY88.3 ft. MGO - General Observation - 90% MISSING104 ft. MGO - General Observation - 100% MISSING TILES105.6 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR112.4 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR134.9 ft. MGO - General Observation - 95% MISSING TILES138.3 ft. SRC - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR143.6 ft. MGO - General Observation - 100% MISSING TILES148.3 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR MISSING153.1 ft. MGO - General Observation - 20% MISSING TILES START171.8 ft. MGO - General Observation - 95% MISSING TILES START175.9 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR179.7 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING183.5 ft. MGO - General Observation - 25% MISSING TILES START183.5 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - MISSING REBAR198.1 ft. MGO - General Observation - 95% MISSING TILES START204.4 ft. SRC - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR207.4 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR BROKEN MISSING211.8 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish - MISSING REBAR215.9 ft. SRC - Surface Reinforcement Corroded, at 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR225.8 ft. DSZ - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - TILES DEBRIE231.9 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR243.2 ft. SRC - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR248 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING251.1 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - MISSING REBAR258.4 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - MISSING REBAR258.4 ft. MGO - General Observation - 30% MISSING TILES START272.9 ft. MGO - General Observation - 90% MISSING TILES279 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR282.1 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - REBAR306.5 ft. MGO - General Observation - 80% MISSING TILES START311.6 ft. SRC - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR349.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG349.5 ft. MGO - General Observation - 80% MISSING TILES FINISH349.5 ft. MGO - General Observation - DEBRIE ON CABLE349.5 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - TILES DEBRIE349.5 ft. MGO - General Observation - MH CONN ACTIVE 9:00349.8 ft. AMH - Downstream Manhole, Survey Ends - 2:55AM

Observation photos (39)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

  • General Observation - 10% MISSING TILES START 8:00 TO 4:0

    2 ft. - General Observation - 10% MISSING TILES START 8:00 TO 4:0

  • General Observation - 90% MISSING TILES START

    16.9 ft. - General Observation - 90% MISSING TILES START

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    20 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM BROKEN MISSING

    26.7 ft. - Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM BROKEN MISSING

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR

    27.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR

  • General Observation - 10% MISSING TILES START

    34.2 ft. - General Observation - 10% MISSING TILES START

  • General Observation - 30% MISSING TILES

    54.6 ft. - General Observation - 30% MISSING TILES

  • General Observation - 90% MISSING TILESW START

    59.7 ft. - General Observation - 90% MISSING TILESW START

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR

    61.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - ALMOST GONE

    69.8 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - ALMOST GONE

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - REBAR CORRODED AWAY

    73.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - REBAR CORRODED AWAY

  • General Observation - 20% MISSING TILES START

    77.9 ft. - General Observation - 20% MISSING TILES START

  • General Observation - 90% MISSING

    88.3 ft. - General Observation - 90% MISSING

  • General Observation - 100% MISSING TILES

    104 ft. - General Observation - 100% MISSING TILES

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

    105.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

  • General Observation - 95% MISSING TILES

    134.9 ft. - General Observation - 95% MISSING TILES

  • Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

    138.3 ft. - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR

  • General Observation - 100% MISSING TILES

    143.6 ft. - General Observation - 100% MISSING TILES

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR MISSING

    148.3 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR MISSING

  • General Observation - 20% MISSING TILES START

    153.1 ft. - General Observation - 20% MISSING TILES START

  • General Observation - 95% MISSING TILES START

    171.8 ft. - General Observation - 95% MISSING TILES START

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    175.9 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING

    179.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING

  • General Observation - 25% MISSING TILES START

    183.5 ft. - General Observation - 25% MISSING TILES START

  • General Observation - 95% MISSING TILES START

    198.1 ft. - General Observation - 95% MISSING TILES START

  • Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR

    204.4 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR BROKEN MISSING

    207.4 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR BROKEN MISSING

  • Deposits Settled Other,  40 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES - TILES DEBRIE

    225.8 ft. - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES - TILES DEBRIE

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR

    231.9 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR

  • Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR

    243.2 ft. - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING

    248 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR MISSING

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - MISSING REBAR

    251.1 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - MISSING REBAR

  • General Observation - 30% MISSING TILES START

    258.4 ft. - General Observation - 30% MISSING TILES START

  • General Observation - 90% MISSING TILES

    272.9 ft. - General Observation - 90% MISSING TILES

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

    279 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

  • General Observation - 80% MISSING TILES START

    306.5 ft. - General Observation - 80% MISSING TILES START

  • Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR

    311.6 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR

  • General Observation - DEBRIE ON CABLE

    349.5 ft. - General Observation - DEBRIE ON CABLE

Observations (56)

DistanceCodeObservation
225.8DSZTILES DEBRIE
104MGO100% MISSING TILES
248SRCLONG CIRCUM REBAR MISSING
198.1MGO95% MISSING TILES START
69.8SRCALMOST GONE
171.8MGO95% MISSING TILES START
179.7SRCLONG CIRCUM REBAR MISSING
175.9SRCCIRCUM REBAR
134.9MGO95% MISSING TILES
231.9SRCLONG CIRCUM REBAR
349.5SAMSEVERE AGG
204.4SRCLONG REBAR
207.4SRCCIRCUM REBAR BROKEN MISSING
279SRCLONG CIRCUM REBAR
0AMH1:15AM
77.9MGO20% MISSING TILES START
258.4SRCMISSING REBAR
272.9MGO90% MISSING TILES
34.2SRCLONG CIRCUM REBAR MISSING
282.1SRCREBAR
105.6SRCLONG CIRCUM REBAR
148.3SRCLONG CIRCUM REBAR MISSING
143.6MGO100% MISSING TILES
311.6SRCLONG REBAR
258.4MGO30% MISSING TILES START
211.8SRCMISSING REBAR
26.7SRCLONG & CIRCUM BROKEN MISSING
2SAMSEVERE AGG AREAS OF MISSING TILES
306.5MGO80% MISSING TILES START
0MWM
243.2SRCLONG CIRCUM REBAR
59.7MGO90% MISSING TILESW START
153.1MGO20% MISSING TILES START
88.3MGO90% MISSING
349.5MGO80% MISSING TILES FINISH
112.4SRCLONG CIRCUM REBAR
77.9SRCLONG CIRCUM REBAR CORRODED AWAY
349.5MGODEBRIE ON CABLE
183.5MGO25% MISSING TILES START
0MWL
34.2MGO10% MISSING TILES START
73.5SRCREBAR CORRODED AWAY
138.3SRCCIRCUM REBAR
215.9SRCCIRCUM REBAR
349.5DSZTILES DEBRIE
20SRVCIRCUM REBAR
2MGO10% MISSING TILES START 8:00 TO 4:0
183.5SRCMISSING REBAR
16.9MGO90% MISSING TILES START
61.5SRCLONG & CIRCUM REBAR
27.7SRCLONG CIRCUM REBAR
54.6MGO30% MISSING TILES
251.1SRCMISSING REBAR
2DSZTILES & DEBRIE
349.8AMH2:55AM
349.5MGOMH CONN ACTIVE 9:00

Properties (4)

custom_field_three
MISSING LONG & CIRCUM REBAR
custom_field_two
1
customer
LACSD
datetime
2017-10-04T00:54:39-07:00