Section#6_G 0314_G 0313__1032017__G6835.mp4
2 ft. - Deposits Settled Other, 35 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - FALLEN TILES & DEBRIE
2 ft. - General Observation - 70% MISSING TILES START 9:00 TO 3:00
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
2.2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
4.2 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
14.3 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBASR
21.9 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
26.3 ft. - Surface Reinforcement Corroded, from 10 to 12 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
36.9 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR
40.3 ft. - Surface Reinforcement Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
41.9 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
48 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR
63.8 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
72.7 ft. - General Observation - 30% MISSING TILES START 8:00 TO 4:00
87.6 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
103 ft. - General Observation - 90% MISSING TILES
111.6 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
123.3 ft. - General Observation - 95% MISSING TILES START
127.1 ft. - Surface Reinforcement Visible, at 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
129.2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
149.6 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
157.8 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - TILES & DEBRIE
160.6 ft. - General Observation - 30% MISSING TILES ATART
175.8 ft. - General Observation - 90% MISSING TILES
176.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
180.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR
197 ft. - Surface Reinforcement Visible, from 10 to 03 o'clock, within 8 inches of joint: YES, - LONG CIRCUM REBAR
210 ft. - General Observation - 50% MISSING
220 ft. - General Observation - 90% MISSING
230 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR
240 ft. - General Observation - 50% MISSING TILES
250 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, - LONG CIRCUM REBAR
260 ft. - General Observation - 90% MISSING
265 ft. - General Observation - 40% MISSING TILES
270 ft. - General Observation - 100% MISSING TILES
270 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM
280 ft. - General Observation - 100% MISSING TILES
282.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM
295.5 ft. - General Observation - DEBRIE ON CABLE
| Distance | Code | Observation |
|---|---|---|
| 21.9 | SRV | CIRCUM REBAR |
| 300.3 | DSZ | FALLEN TILES |
| 127.1 | SRV | CIRCUM REBAR |
| 2 | DSZ | FALLEN TILES & DEBRIE |
| 40.3 | SRV | LONG CIRCUM REBAR |
| 260 | MGO | 90% MISSING |
| 103 | MGO | 90% MISSING TILES |
| 72.7 | MGO | 30% MISSING TILES START 8:00 TO 4:00 |
| 129.2 | SRC | LONG CIRCUM REBAR |
| 0 | MWL | — |
| 287.2 | SRC | CIRCUM REBAR |
| 2.2 | SRC | CIRCUM REBAR |
| 0 | MWM | — |
| 275 | SRC | LONG CIRCUM REBAR |
| 270 | MGO | 100% MISSING TILES |
| 72.7 | DSZ | FALLEN TILES |
| 270 | SRV | CIRCUM |
| 63.8 | SRV | CIRCUM REBAR |
| 2 | MGO | 70% MISSING TILES START 9:00 TO 3:00 |
| 87.6 | SRV | CIRCUM REBAR |
| 197 | SRV | LONG CIRCUM REBAR |
| 41.9 | SRV | CIRCUM REBAR |
| 123.3 | MGO | 95% MISSING TILES START |
| 300.6 | AMH | 3:35AM |
| 72.7 | MWM | — |
| 4.2 | SRV | CIRCUM REBAR |
| 72.7 | MWL | — |
| 220 | MGO | 90% MISSING |
| 14.3 | SRV | CIRCUM REBASR |
| 175.8 | MGO | 90% MISSING TILES |
| 36.9 | SRV | LONG REBAR |
| 105.3 | SRV | CIRCUM REBAR |
| 295.5 | MGO | DEBRIE ON CABLE |
| 280 | MGO | 100% MISSING TILES |
| 111.6 | SRV | CIRCUM REBAR |
| 157.8 | DSZ | TILES & DEBRIE |
| 250 | SRC | LONG CIRCUM REBAR |
| 2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 230 | SRV | LONG REBAR |
| 176.7 | SRC | LONG CIRCUM REBAR |
| 0 | AMH | 2:30AM |
| 48 | SRV | LONG CIRCUM REBAR |
| 149.6 | SRV | CIRCUM REBAR |
| 187 | MGO | DEBRIE ON CABLE AFFECTED FOOTAGE COUNTER |
| 71.1 | DAGS | — |
| 240 | MGO | 50% MISSING TILES |
| 160.6 | MGO | 30% MISSING TILES ATART |
| 210 | MGO | 50% MISSING |
| 180.6 | SRC | LONG CIRCUM REBAR |
| 282.6 | SRC | CIRCUM |
| 300.3 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 139.9 | SRC | LONG CIRCUM REBAR |
| 26.3 | SRC | CIRCUM REBAR |
| 265 | MGO | 40% MISSING TILES |