2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES
2 ft. - Deposits Settled Other, 35 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - TILES DEBRIE UNDER FLOW
2 ft. - General Observation - MISSING TILES 100% START 9:00 TO 3:00
3 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR
8 ft. - General Observation - MAG COAT 40% START 9:00 TO 3:00
39.7 ft. - General Observation - 30% MISSING TILES
55.6 ft. - General Observation - 90% MISSING TILES
58.1 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
64.3 ft. - General Observation - 100% MISSING TILES
80.5 ft. - General Observation - 40% MISSING TILES
87.5 ft. - General Observation - 10% MISSING TILES START
100.2 ft. - General Observation - 95% MISSING TILES
117.6 ft. - General Observation - 50% MISSING TILES
125.3 ft. - General Observation - 100% MISSING TILES
147.9 ft. - General Observation - 100% MISSING TILES
154.4 ft. - General Observation - 95% MISSING TILES START
174.5 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: NO - LONG REBAR
177.1 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
184.6 ft. - General Observation - 95% MISSING TILES START
187.4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
206.8 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM
228.2 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish - LONG & CIRCUM REBAR
239.5 ft. - Surface Reinforcement Visible, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM
241.4 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR
244.9 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
247.1 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR
258.5 ft. - General Observation - 99% MISSING TILES
286.9 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM
298.4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 8 | MGO | MAG COAT 40% START 9:00 TO 3:00 |
| 29.8 | DSZ | TILES |
| 201.5 | SRV | CIRCUM |
| 100.2 | MGO | 95% MISSING TILES |
| 0 | MWL | — |
| 0 | MWM | — |
| 2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 80.5 | MGO | 40% MISSING TILES |
| 187.4 | SRV | CIRCUM REBAR |
| 55.6 | MGO | 90% MISSING TILES |
| 64.3 | MGO | 100% MISSING TILES |
| 58.1 | SRV | CIRCUM REBAR |
| 7.9 | MGO | 20% MISSING TILES START 9:00 TO 3:00 |
| 177.1 | SRV | CIRCUM REBAR |
| 313 | MGO | MISSING TILES 95% FINISH |
| 39.7 | MGO | 30% MISSING TILES |
| 228.2 | SRC | LONG & CIRCUM REBAR |
| 174.5 | SRV | LONG REBAR |
| 122 | DSZ | TILES FALLEN |
| 184.6 | MGO | 95% MISSING TILES START |
| 244.9 | SRV | CIRCUM REBAR |
| 87.5 | MGO | 10% MISSING TILES START |
| 241.4 | SRC | LONG REBAR |
| 247.1 | SRV | LONG REBAR |
| 117.6 | MGO | 50% MISSING TILES |
| 6 | SRV | CIRCUM REBAR |
| 239.5 | SRV | CIRCUM |
| 154.4 | MGO | 95% MISSING TILES START |
| 210.8 | DSZ | FALLEN TILES |
| 313.7 | AMH | 2:15AM |
| 0 | AMH | 1:15AM |
| 147.9 | MGO | 100% MISSING TILES |
| 2 | DSZ | TILES DEBRIE UNDER FLOW |
| 125.3 | MGO | 100% MISSING TILES |
| 298.4 | SRV | CIRCUM REBAR |
| 206.8 | SRC | LONG & CIRCUM |
| 3 | SRV | CIRCUM REBAR |
| 286.9 | SRV | CIRCUM |
| 313 | DSZ | FALLEN TILES |
| 2 | MGO | MISSING TILES 100% START 9:00 TO 3:00 |
| 258.5 | MGO | 99% MISSING TILES |
| 313 | SAM | SEVERE AGG AREAS OF MISSING TILES |