G 0328_G 0327_9292017_045345.mp4
2 ft. - General Observation - CONCRETE EXTRA CHANNELS SIDES OF PIPE
2 ft. - General Observation - 1ILES 100% IN PLACE
2 ft. - General Observation - MAG COAT 100% START 8:00 TO 4:00
74.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
195.5 ft. - General Observation - MAG COAT 100%
252.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
296.3 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 07 o'clock, , within 8 inches of joint: YES - STOPPED CAMERA
| Distance | Code | Observation |
|---|---|---|
| 296.3 | MGO | TILES 100% FINISH |
| 296.3 | MGO | MAG COAT 100% FINISH |
| 195.5 | MGO | MAG COAT 100% |
| 0 | MWM | — |
| 252.2 | DAGS | — |
| 252.2 | DAGS | — |
| 296.3 | DAGS | STOPPED CAMERA |
| 0 | MWL | — |
| 0 | AMH | 4:55AM |
| 15.7 | DSZ | SLUDGE |
| 2 | MGO | CONCRETE EXTRA CHANNELS SIDES OF PIPE |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 2 | MGO | 1ILES 100% IN PLACE |
| 296.3 | DAGS | — |
| 296.8 | MSA | 20% GREASE BALL- WILL COMPLETE REVERSE 5:30AM |
| 74.4 | DAGS | — |
| 2 | MGO | MAG COAT 100% START 8:00 TO 4:00 |