Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 29, 2017, 09:54 AM
  • G 0330_G 0329_9292017_030033.mp4

Date
09/29/2017
W/O
0646225
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00228
PipeID
P01766
Time
2:54 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0648
Sewer Name
01 JOINT OUTFALL G - UNIT 9 TRUNK
City
BELL GARDENS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Capital Improvement Program Assesment
Project
20170929MDM_JOINT_OUTFALL_G_UNIT_9_TRUNK
Material
RCP-CTL
Shape
Circular
Height
30 in.
Upstream MH
G 0330
Downstream MH
G 0329
Dir. of Survey
Downstream
Length Surveyed
285.9 ft.
Total Length
285.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2600
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole G 0330 to G 0329
MH: G 0330MH: G 0329downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:00AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - TILES 100% IN PLACE START0 ft. MWL - Water Level, 10 %of cross sectional area4 ft. MGO - General Observation - MAG COAT 90% START 8:00 TO 4:0019.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - SLUDGE & PAPER69.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE91.9 ft. MGO - General Observation - 80% MAG COAT START124.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start139.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Finish139.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES162.8 ft. MGO - General Observation - MAG COAT 95% START180.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO225 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start269.9 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish285.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE & PAPER285.7 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active285.7 ft. MGO - General Observation - MAG COAT 95% FINISH285.7 ft. MGO - General Observation - TILES 100% IN PLACE FINISH285.9 ft. AMH - Downstream Manhole, Survey Ends - 3:25AM

Observation photos (8)

  • General Observation - TILES 100% IN PLACE START

    0 ft. - General Observation - TILES 100% IN PLACE START

  • General Observation - MAG COAT 90% START 8:00 TO 4:00

    4 ft. - General Observation - MAG COAT 90% START 8:00 TO 4:00

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES - SLUDGE & PAPER

    19.8 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - SLUDGE & PAPER

  • General Observation - 80% MAG COAT START

    91.9 ft. - General Observation - 80% MAG COAT START

  • Deposits Attached Grease, 10 %of cross sectional area, from 07 to 09 o'clock,  , within 8 inches of joint: YES, Start

    124.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 05 o'clock,  , within 8 inches of joint: YES

    139.5 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES

  • General Observation - MAG COAT 95% START

    162.8 ft. - General Observation - MAG COAT 95% START

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    225 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0AMH3:00AM
0MWM
0MGOTILES 100% IN PLACE START
285.7DSZSLUDGE & PAPER
139.5DAGS
124.8DAGS
180.3DAGS
0MWL
285.7MGOConn. @ Mh, 9 O' Clock. Active
19.8DSZSLUDGE & PAPER
91.9MGO80% MAG COAT START
162.8MGOMAG COAT 95% START
285.9AMH3:25AM
69.5DSZSLUDGE
285.7MGOMAG COAT 95% FINISH
139.5DAGS
4MGOMAG COAT 90% START 8:00 TO 4:00
285.7MGOTILES 100% IN PLACE FINISH
269.9DAGS
225DAGS

Properties (4)

custom_field_three
TILE LINE - TILES 100% IN PLACE
custom_field_two
3
customer
LACSD
datetime
2017-09-29T02:54:17-07:00