Wastewater/Activity/PacpInspection/1.0Aug 16, 2017, 06:08 AM
  • 08 0227_08 0226_08152017_232158.mp4

Date
08/15/2017
W/O
646329
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00005
PipeID
P00101
Time
11:08 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4689
Sewer Name
08 EAST ROAD TRUNK
City
TORRANCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_646329_TV08112_JUL2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
08 0227
Downstream MH
08 0226
Dir. of Survey
Downstream
Length Surveyed
135.9 ft.
Total Length
135.9 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 08 0227 to 08 0226
MH: 08 0227MH: 08 0226downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 02274.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.9 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start44.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"53.4 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 4"113 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4"135.9 ft. AMH - Downstream Manhole, Survey Ends - 08 0226135.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish135.9 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish135.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish135.9 ft. MGO - General Observation - CONNECTION AT 3 OC

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
53.4TB
135.9AMH08 0226
4.2CM
135.9CM
4.2DAGS
135.9FH2
0MWL
113TF
135.9DAGS
0MWM
44.1TFC
6.9FH2
135.9MGOCONNECTION AT 3 OC
0AMH08 0227

Properties (5)

additional_info
SC345628
custom_field_two
3
customer
LACSD
datetime
2017-08-15T23:08:48-07:00
sewer_category
Gravity