Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 21, 2017, 07:25 AM
  • 22 1081_22 1080 _21072017_004458.mp4

Date
07/21/2017
W/O
646476
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00812
PipeID
P17454
Time
12:25 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4665
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Routine Assessment
Project
WO_646476_TV22042_JUL2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1081
Downstream MH
22 1080
Dir. of Survey
Downstream
Length Surveyed
337.7 ft.
Total Length
337.7 ft.
Structural Index
4
Structural Quick
4100
Structural Rating
4
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 1081 to 22 1080
MH: 22 1081MH: 22 1080downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10810 ft. MWM - Water Mark, 40 %of cross sectional area4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start81.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"99.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"99.6 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"158.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"181.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"194 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4"227.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"250.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"273.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"278.5 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 4"311.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"314.5 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 4"329.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"337.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.7 ft. AMH - Downstream Manhole, Survey Ends - 22 1080337.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
250.4TF
0MWL
278.5TB
99.6TF
329.5TF
4DAGS
9.1FM
158.5TFC
181.1TF
311.7TFC
0AMH22 1081
273.1TFC
337.7FM
337.7AMH22 1080
337.7DAGS
99.6TB
194TF
0MWM
227.2TFC
314.5TB
81.8TFC

Properties (4)

additional_info
SC345603
custom_field_two
3
customer
LACSD
datetime
2017-07-21T00:25:46-07:00