Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 2, 2017, 10:02 AM
  • Section#2_08 0471_08 0470__922017__G6814.mp4

Date
09/02/2017
W/O
0651723
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00026
PipeID
P00527
Time
3:02 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6814
Sewer Name
08 216TH STREET TRUNK
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20170901MDM_216TH_STREET_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
08 0471
Downstream MH
08 0470
Dir. of Survey
Downstream
Length Surveyed
470.7 ft.
Total Length
470.7 ft.
Structural Index
5
Structural Quick
5S4R
Structural Rating
866
O&M Index
2
O&M Quick
512R
O&M Rating
193
Overall Index
4
Overall Quick
Overall Rating
1059
Pipe schematic from manhole 08 0471 to 08 0470
MH: 08 0471MH: 08 0470downstream0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:05AM2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES2 ft. MGO - General Observation - MAG COAT 99% START 10:00 TO 2:002 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start15.1 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR69 ft. MGO - General Observation - TILES 95% IN PLACE UNDER MAG COAT START87.4 ft. MGO - General Observation - 100% MISSING TILES89.4 ft. SRC - Surface Reinforcement Corroded, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR111.4 ft. MGO - General Observation - 95% MISSING TILES START122.6 ft. SRC - Surface Reinforcement Corroded, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR126 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR135.8 ft. MGO - General Observation - 100% TILES151.7 ft. SRC - Surface Reinforcement Corroded, from 12 to 01 o'clock, within 8 inches of joint: NO - LONG % CIRCUM REBAR158.9 ft. SRC - Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR173.9 ft. MGO - General Observation - 2 ROWS TILE IN PLACE205.8 ft. MGO - General Observation - 2 ROWS TILES IN PLACE260.3 ft. MGO - General Observation - MISSING TILES 95% FINISH260.3 ft. MGO - General Observation - 40% MISSING TILES274.7 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR381.3 ft. MGO - General Observation - 40% MISSING TILES437.7 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR470.3 ft. MGO - General Observation - MISSING TILES 40%470.3 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SREAS OF MISSING TILES470.3 ft. MGO - General Observation - 95% MAG COAT FINISH470.3 ft. MGO - General Observation - MH CONN ACTIVE 9:00470.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish470.3 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - BROKEN,MISSING REBAR LONG & CIRCUM470.7 ft. AMH - Downstream Manhole, Survey Ends - 3:50AM

Observation photos (19)

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES

    2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES

  • General Observation - MAG COAT 99% START 10:00 TO 2:00

    2 ft. - General Observation - MAG COAT 99% START 10:00 TO 2:00

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

    15.1 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR

  • General Observation - TILES 95% IN PLACE UNDER MAG COAT START

    69 ft. - General Observation - TILES 95% IN PLACE UNDER MAG COAT START

  • General Observation - 100% MISSING TILES

    87.4 ft. - General Observation - 100% MISSING TILES

  • Surface Reinforcement Corroded, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    89.4 ft. - Surface Reinforcement Corroded, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • General Observation - 95% MISSING TILES START

    111.4 ft. - General Observation - 95% MISSING TILES START

  • Surface Reinforcement Corroded, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    122.6 ft. - Surface Reinforcement Corroded, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

    126 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

  • General Observation - 100%  TILES

    135.8 ft. - General Observation - 100% TILES

  • Surface Reinforcement Corroded, from 12 to 01 o'clock, within 8 inches of joint: NO - LONG % CIRCUM REBAR

    151.7 ft. - Surface Reinforcement Corroded, from 12 to 01 o'clock, within 8 inches of joint: NO - LONG % CIRCUM REBAR

  • Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    158.9 ft. - Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • General Observation - 2 ROWS TILE IN PLACE

    173.9 ft. - General Observation - 2 ROWS TILE IN PLACE

  • General Observation - 2 ROWS TILES IN PLACE

    205.8 ft. - General Observation - 2 ROWS TILES IN PLACE

  • General Observation - 40% MISSING TILES

    260.3 ft. - General Observation - 40% MISSING TILES

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    274.7 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • General Observation - 40% MISSING TILES

    381.3 ft. - General Observation - 40% MISSING TILES

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

    437.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

Observations (30)

DistanceCodeObservation
470.3MGOMISSING TILES 40%
260.3MGOMISSING TILES 95% FINISH
470.3SAMSREAS OF MISSING TILES
15.1SRCCIRCUM REBAR
158.9SRCCIRCUM REBAR
470.3MGO95% MAG COAT FINISH
2SAMAREAS OF MISSING TILES
0MWM
0MWL
111.4MGO95% MISSING TILES START
173.9MGO2 ROWS TILE IN PLACE
2MGOMAG COAT 99% START 10:00 TO 2:00
69MGOTILES 95% IN PLACE UNDER MAG COAT START
470.3MGOMH CONN ACTIVE 9:00
89.4SRCCIRCUM REBAR
381.3MGO40% MISSING TILES
274.7SRCCIRCUM REBAR
470.3DAGS
122.6SRCCIRCUM REBAR
205.8MGO2 ROWS TILES IN PLACE
2DAGS
126SRCBROKEN REBAR
470.3SRCBROKEN,MISSING REBAR LONG & CIRCUM
0AMH3:05AM
135.8MGO100% TILES
470.7AMH3:50AM
87.4MGO100% MISSING TILES
151.7SRCLONG % CIRCUM REBAR
437.7SRCBROKEN REBAR
260.3MGO40% MISSING TILES

Properties (4)

custom_field_three
MISSING REBAR
custom_field_two
1
customer
LACSD
datetime
2017-09-02T03:02:47-07:00