Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2017, 05:32 AM
  • 02 1008_02 1007 _20170725_225411.mp4

Date
07/25/2017
W/O
646392
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00280
PipeID
P03582
Time
10:32 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4761
Sewer Name
02 MONTEBELLO CITY TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
WO_646392_TV02077_JUL2017
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1008
Downstream MH
02 1007
Dir. of Survey
Downstream
Length Surveyed
365.9 ft.
Total Length
365.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 02 1008 to 02 1007
MH: 02 1008MH: 02 1007downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 10080 ft. MWM - Water Mark, 10 %of cross sectional area66.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"227.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"234.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"280.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"365.9 ft. AMH - Downstream Manhole, Survey Ends - 02 1007

Observations (10)

DistanceCodeObservation
234.8TFA
66.6TF
365.9AMH02 1007
0MGOCONNECTION AT MH 9 O'CLOCK
152.1TF
0MWL
0AMH02 1008
0MWM
227.1TF
280.2TF

Properties (5)

additional_info
SC345521
custom_field_two
4
customer
LACSD
datetime
2017-07-25T22:32:25-07:00
sewer_category
Gravity