Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 2, 2017, 04:50 AM
  • J 0014_J 0012 _20170802_001432.mp4

Date
08/01/2017
W/O
646290
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00060
PipeID
P11597
Time
9:50 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4675
Sewer Name
J JOINT OUTFALL J - UNIT 2A
City
HARBOR CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
33
Purpose
Routine Assessment
Project
WO_646290_TV08100_JUL2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
J 0014
Downstream MH
J 0012
Dir. of Survey
Downstream
Length Surveyed
476.4 ft.
Total Length
476.4 ft.
Structural Index
4
Structural Quick
5Q3K
Structural Rating
632
O&M Index
2
O&M Quick
412R
O&M Rating
190
Overall Index
3
Overall Quick
Overall Rating
822
Pipe schematic from manhole J 0014 to J 0012
MH: J 0014MH: J 0012downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 00140 ft. MWL - Water Level, 20 %of cross sectional area0.1 ft. MWM - Water Mark, 50 %of cross sectional area13.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start13.2 ft. MGO - General Observation - RESUMING VIDEO20.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start179.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start476.4 ft. MGO - General Observation - CONNECTION AT 9 OC476.4 ft. AMH - Downstream Manhole, Survey Ends - J 0012476.4 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish476.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish476.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish476.4 ft. MGO - General Observation - CONNECTION AT 3 OC

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    13.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.4 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    179.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
13.2DAGS
476.4MGOCONNECTION AT 9 OC
0AMHJ 0014
20.4SRV
476.4AMHJ 0012
13.2MGORESUMING VIDEO
476.4SRV
179.7SAP
0.1MWM
476.4SAP
476.4DAGS
476.4MGOCONNECTION AT 3 OC
0MWL

Properties (4)

additional_info
SC345613
custom_field_two
3
customer
LACSD
datetime
2017-08-01T21:50:43-07:00