Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2017, 10:25 AM
Date
07/18/2017
W/O
635631
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00438
PipeID
P06701
Time
3:25 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3989-SC345554
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_635631_TV05253_JUN2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
05 1477
Downstream MH
05 1476
Dir. of Survey
Downstream
Length Surveyed
336.6 ft.
Total Length
336.6 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
3
Overall Quick
Overall Rating
334
Pipe schematic from manhole 05 1477 to 05 1476
MH: 05 1477MH: 05 1476downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 14772 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"78.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"81.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"123.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"126.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"163.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"178.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"227.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"279.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"321.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"333.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish333.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish336.5 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK336.5 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK336.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1476

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - CONNECTION AT THE MH 9 O'CLOCK

    336.5 ft. - General Observation - CONNECTION AT THE MH 9 O'CLOCK

  • General Observation - CONNECTION AT THE MH 3 O'CLOCK

    336.5 ft. - General Observation - CONNECTION AT THE MH 3 O'CLOCK

Observations (20)

DistanceCodeObservation
227.2TB
336.5MGOCONNECTION AT THE MH 9 O'CLOCK
321.7TFC
333.4DAGS
178.6TB
126.9TB
163.5TFC
0MWL
336.6AMH05 1476
123.6TFC
333.4SAV
81.8TB
0MWM
2DAGS
0AMH05 1477
336.5MGOCONNECTION AT THE MH 3 O'CLOCK
26.8TF
2SAV
78.1TFC
279.2TB

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-07-18T03:25:25-07:00