Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2017, 09:40 AM
  • Section#8_F 0206_F 0205__8162017__G6802.mp4

Date
08/16/2017
W/O
0646419
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00048
PipeID
P10336
Time
2:40 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6803
Sewer Name
F JOINT OUTFALL F - UNIT 7F
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Capital Improvement Program Assesment
Project
20170812MDM_JOINT_OUTFALL_F_UNIT_7F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
F 0206
Downstream MH
F 0205
Dir. of Survey
Downstream
Length Surveyed
365.9 ft.
Total Length
365.9 ft.
Structural Index
2
Structural Quick
2N00
Structural Rating
148
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
148
Pipe schematic from manhole F 0206 to F 0205
MH: F 0206MH: F 0205downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MGO - General Observation - OLD MAG COAT 80% START 8:00 TO 4:000 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT38.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB134.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB139.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE UNDER MAG COAT146 ft. MGO - General Observation - 80% MAG COAT149.6 ft. MGP - General Photograph242.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB301.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB365.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE365.1 ft. MGO - General Observation - MAG COAT 80% FINISH365.9 ft. AMH - Downstream Manhole, Survey Ends - 3:50AM

Observation photos (5)

  • General Observation - OLD MAG COAT 80% START 8:00 TO 4:00

    0 ft. - General Observation - OLD MAG COAT 80% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE UNDER MAG COAT

    139.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • General Observation - 80% MAG COAT

    146 ft. - General Observation - 80% MAG COAT

  • General Photograph

    149.6 ft. - General Photograph

Observations (15)

DistanceCodeObservation
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
365.9AMH3:50AM
0MWM
0AMH3:15AM
365.1SSSBLISTERING PEELING CONCRETE
38.6TFCSTUB
139.2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
242.3TFCSTUB
149.6MGP
0MGOOLD MAG COAT 80% START 8:00 TO 4:00
0MWL
146MGO80% MAG COAT
365.1MGOMAG COAT 80% FINISH
301.8TFCSTUB
134.3TFCSTUB

Properties (4)

custom_field_three
80% MA COAT
custom_field_two
5
customer
LACSD
datetime
2017-08-16T02:40:33-07:00