Section#3_F 0211_F 0210__8122017__G6799.mp4
2 ft. - General Observation - MAG COAT 98% START 8:00 TO 4:00
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
6.4 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
100.4 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
103.2 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
332.3 ft. - General Observation - MAG COATB 98%
537.7 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
564.1 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: YES
564.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB- POSSIBLE
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 100.4 | DAGS | — |
| 0 | MWL | — |
| 275 | TFC | STUB |
| 100.4 | TF | ACTIVE |
| 594.6 | MGO | MAG COAT 98% FINISH |
| 103.2 | DAE | — |
| 564.1 | DAE | — |
| 553.5 | DAGS | — |
| 332.3 | MGO | MAG COATB 98% |
| 479.1 | TFC | STUB |
| 381.9 | TFC | STUB |
| 2 | MGO | MAG COAT 98% START 8:00 TO 4:00 |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 594.6 | SSS | BLISTERING PEELING CONCRETE |
| 95.5 | TFC | STUB |
| 110.1 | DAGS | — |
| 0 | AMH | 5:50AM |
| 594.9 | AMH | 6:20AM |
| 537.7 | DAGS | — |
| 214.6 | TFC | STUB |
| 564.1 | TFC | STUB- POSSIBLE |
| 6.4 | DAE | — |