Section#1_F 0212_F 0211A__8122017__G6799.mp4
0 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: NO - INSIDE MH
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BL;ISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC
9.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES, Start
25.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
25.6 ft. - General Observation - OLD MAG COAT ON PIPE 95% START 8:00 TO 4:00
119.6 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG UNDER MAG COAT
256 ft. - General Observation - OIL LAYER ON MAG COAT FROM HOT FLOW
| Distance | Code | Observation |
|---|---|---|
| 0 | DAGS | INSIDE MH |
| 415.1 | SAV | SEVERE AGG |
| 256 | MGO | OIL LAYER ON MAG COAT FROM HOT FLOW |
| 415.1 | SSS | BLISTERING PEELING CONCRETE |
| 415.1 | MGO | MAG COAT COAT 98% FINISH |
| 415.1 | MGO | MH CONN 9:00 ACTIVE |
| 199.2 | TFC | STUB |
| 0 | MGO | MH CONN ACTIVE 3:00 |
| 25.6 | DAGS | — |
| 2 | SSS | BL;ISTERING PEELING CONCRETE |
| 415.1 | MGO | MH CONN ACTIVE 9:30 ACTIVE |
| 116.3 | TF | OPEN |
| 119.6 | SAV | SEVERE AGG UNDER MAG COAT |
| 25.6 | DAGS | — |
| 415.1 | DAGS | — |
| 415.6 | AMH | 5:10AM |
| 93 | TF | OPEN |
| 0 | MWL | — |
| 0 | AMH | 4:35AM |
| 9.1 | DAGS | — |
| 364 | TB | ACTIVE |
| 25.6 | MGO | OLD MAG COAT ON PIPE 95% START 8:00 TO 4:00 |
| 0 | MWM | — |
| 2 | SAV | SEVERE AGG SPORATIC |