Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2016, 09:14 AM
  • 05 1469A_05 1469_062116_021448.mpg

Date
06/21/2016
W/O
574372
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06692
Time
2:14 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3401
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_574372_TV05300_JUNE2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
05 1469A
Downstream MH
05 1469
Dir. of Survey
Downstream
Length Surveyed
143.1 ft.
Total Length
143.1 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
133
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
133
Pipe schematic from manhole 05 1469A to 05 1469
MH: 05 1469AMH: 05 1469downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 1469A2.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start8.7 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start16.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"63.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"114.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"138.7 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish138.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish143.1 ft. MGO - General Observation - CONNECTION AT THE MH CAPPED 3 O'CLOCK143.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1469

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    8.7 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
143.1MGOCONNECTION AT THE MH CAPPED 3 O'CLOCK
138.7SSS
138.7SAP
0MWM
0MGOCONNECTION AT THE MH 9 O'CLOCK
0MWL
16.5TFC
0AMH05 1469A
63.8TFC
2.7SAP
143.1AMH05 1469
8.7SSS
114.6TF