Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2016, 08:59 AM
  • 05 1470_05 1469A_062116_020019.mpg

Date
06/21/2016
W/O
574372
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00438
PipeID
P06693
Time
1:59 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3401
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_574372_TV05300_JUNE2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
05 1470
Downstream MH
05 1469A
Dir. of Survey
Downstream
Length Surveyed
198.9 ft.
Total Length
198.9 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
193
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
193
Pipe schematic from manhole 05 1470 to 05 1469A
MH: 05 1470MH: 05 1469Adownstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 14700 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"66.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"113.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"170.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"195 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish195 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish198.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK198.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1469A

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 3 O'CLOCK
198.9MGOCONNECTION AT THE MH 9 O'CLOCK
195SAP
15.4TF
170.7TF
0AMH05 1470
0MWM
164.6TFC
113.7TFC
66.2TF
198.9AMH05 1469A
2.1SAP
7.1SSS
0MWL
195SSS

Properties (4)

additional_info
SC305851
custom_field_two
2
customer
LACSD
datetime
2016-06-21T01:59:19-07:00