Wastewater/Activity/PacpInspection/1.0Aug 22, 2017, 07:38 AM
  • 05 1850_05 1837_8222017_025830.mp4

Date
08/22/2017
W/O
0652016
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00490
PipeID
P07075
Time
12:38 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0617
Sewer Name
05 NARBONNE AVENUE TRUNK, SECTION 1(EAST)
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
35
Purpose
Routine Assessment
Project
20170821MDM_NARBONNE_AVENUE_TRUNK_SECTION_1_EAST
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
05 1850
Downstream MH
05 1837
Dir. of Survey
Downstream
Length Surveyed
355.2 ft.
Total Length
355.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 05 1850 to 05 1837
MH: 05 1850MH: 05 1837downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:55AM0 ft. MWM - Water Mark, 20 %of cross sectional area21.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open26.9 ft. MGO - General Observation - 8" VCP26.9 ft. MWM - Water Mark, 40 %of cross sectional area45.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open51.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - HARD GREASE68.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - HARD GREASE133.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open145.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open211.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open223.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open226.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES236.9 ft. MGP - General Photograph280.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped355 ft. MGO - General Observation - MH CONN ACTIVE 9:00355.2 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (3)

  • General Observation - 8" VCP

    26.9 ft. - General Observation - 8" VCP

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - HARD GREASE

    68.2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - HARD GREASE

  • General Photograph

    236.9 ft. - General Photograph

Observations (18)

DistanceCodeObservation
68.2DSZHARD GREASE
226.6DAGS
0MWL
26.9MGO8" VCP
211.5TFOpen
145.1TFOpen
45.9TFOpen
0AMH2:55AM
355.2AMH3:40AM
21.8TFOpen
133.6TFOpen
223.2TFOpen
236.9MGP
0MWM
355MGOMH CONN ACTIVE 9:00
51.9DSZHARD GREASE
26.9MWM
280.2TFCCapped

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2017-08-22T00:38:45-07:00