Wastewater/Activity/PacpInspection/1.0Jun 21, 2017, 07:36 AM
  • 14 0294_14 0293A_21062017_003710.mp4

Date
06/21/2017
W/O
641141
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P18357
Time
12:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4588
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
WO_641141_TV14041_JUN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0294
Downstream MH
14 0293A
Dir. of Survey
Downstream
Length Surveyed
151.7 ft.
Total Length
151.7 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
150
O&M Index
2
O&M Quick
2E00
O&M Rating
60
Overall Index
2
Overall Quick
Overall Rating
210
Pipe schematic from manhole 14 0294 to 14 0293A
MH: 14 0294MH: 14 0293Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02942 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start149.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish149.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish149.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish151.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE151.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK151.7 ft. AMH - Downstream Manhole, Survey Ends - 14 0293A

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWL
2SAP
151.7MGOCOCKROACHES IN MANHOLE
149.9SAP
151.7MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWM
2SSS
149.9DAGS
149.9SSS
0AMH14 0294
2DAGS
151.7AMH14 0293A

Properties (4)

additional_info
SC345414
custom_field_two
2
customer
LACSD
datetime
2017-06-21T00:36:47-07:00